Image from Google Jackets

Application of value stream mapping for delivery lead time reduction in a construction equipment manufacturing industry : a dissertation report

By: Singh,NarendraContributor(s): Jain,RakeshMaterial type: TextTextPublication details: Jaipur Dept.of Mechanical engineering.,Malaviya Natioanl Institute of Technology 2014. Description: xi,48 pSubject(s): Mechanical engineering | Construction equipment | Manufacturing industry
Star ratings
    Average rating: 0.0 (0 votes)