000 00560pam a2200145a 44500
999 _c59543
_d59543
008 140414b2013 xxu||||| |||| 00| 0 eng d
100 _aAGARWAL , DEEPAK (2011PMM5059)
245 _aAN APPLICATION OF VALUE STREAM MAPPING TO REDUCE CYCLE TIME AND WIP IN AN ASSEMBLY LINE
_c: A Dissertation Report
260 _aJAIPUR
_bDEPARTMENT OF MECHANICAL ENGINEERING , MNIT
_c2013
300 _avp.
650 _aMECHANICAL ENGINEERING
650 _a VALUE STREAM MAPPING TO REDUCE CYCLE TIME AND WIP IN AN ASSEMBLY LINE
700 _aMITTAL, M L
_eSupvr
942 _cDS